Switching practice management systems: when and how

Switching practice management systems: when it pays off and when fixing the current one is enough. What to check in your contract and when to go live.

Switching practice management systems pays off when the current system holds your clinic back. A nicer look is not reason enough. Typical reasons for a change are missing features (billing, integrations, new outpatient units), a product being phased out or poor vendor support. Growth to several sites and rising costs can also be reasons.

Before you sign with a new vendor, prepare for the change. Describe your needs and check the contract with your current vendor: data access, export, notice period. Plan what will happen to the records in the old system. Pick a quiet go-live date and appoint the people responsible on your team.

Signs it is time to change your practice management system

  • Features are missing that you need to grow, such as handling a new type of service, billing another payer, or several sites working on a shared patient database.
  • Integrations with the laboratory, the picture archiving and communication system (PACS), online booking or accounting systems are impossible or expensive.
  • The vendor is phasing out the product or its support. Without new versions, changes in the law and in the requirements of P1, Poland’s national e-health platform, become a problem over time.
  • Staff work around the system: they keep spreadsheets, paper notes and separate calendars alongside it.
  • Costs grow faster than value, because you keep paying for extra modules that are standard in other systems.

When does switching not pay off?

Some of the problems blamed on the system have a different cause. Before you decide to switch, check:

Symptom Possible cause outside the system
The system is slow or freezes an overloaded server, old computers, a weak network or Wi-Fi, the internet connection for a cloud system
Doctors cannot do something the feature may exist but is not configured, or staff have not been trained to use it
Printouts and forms look wrong configuration of document templates
Billing needs manual work missing configuration or an unused module

If the cause is the infrastructure, a new system will not fix it. You will only move the problem to a new environment. Our article on network segmentation in a clinic shows how we split a clinic network into segments.

Analysing your needs before a switch

We start a medical system implementation with a conversation. The system demo comes later. The first online meeting is free of charge. In it, we outline which options fit your needs. Then we go through the questions that decide the choice:

  1. Type of practice: primary care, specialist outpatient units, rehabilitation, diagnostic imaging, laboratory, hospital treatment.
  2. Payers: only the National Health Fund (NFZ, Poland’s public health insurer), only private services or both, and whether you work with corporate medical plans and insurers.
  3. Scale: number of sites, workstations and users today and in two years.
  4. Integrations: laboratory, PACS and the radiology information system (RIS), online booking, finance and accounting systems.
  5. Data to move: what is in the current system and what of it has to go into the new one.
  6. Infrastructure: whether the system should run in the cloud or on your own server. See our article Optimed NXT: cloud or on-premises server? for the differences.
  7. Budget and funding: the cost of implementation, licences and support after go-live over several years. The first invoice is only part of the cost.

The result is a list of requirements against which you can compare systems, the ones we implement and any others.

Your contract with the current vendor: what to check before giving notice

The most common mistake is giving notice before you know how to get your data back. Check the contract and ask the vendor about:

  • the notice period and the end date of the contract, so the old system keeps running until the new one goes live
  • data export: in what format and scope (patients, appointments, records, schedules), who does it and whether it costs extra
  • access after the contract ends: whether you can keep read-only access and on what terms
  • licences: whether licences you bought expire together with the service contract

What happens to the records in the old system?

Medical records do not disappear with the old system. Under Art. 29 of the Act on Patient Rights and the Patient Ombudsman, a healthcare provider must, as a rule, keep them for 20 years from the end of the year in which the last entry was made. The act also sets longer and shorter periods for some types of records (ISAP, Journal of Laws 2009 No. 52, item 417, as amended, in Polish; legal status as of 18 November 2026).

There are two routes, often combined:

  • moving the records into the new system, which is convenient for doctors but depends on what can be exported and imported
  • a read-only archive, meaning the old system or a data export available to authorised people for the whole retention period

Decide before you give notice, because this decision determines what you negotiate with the current vendor.

Go-live date for the new system

  • Go live outside your busiest period. Avoid the peak of the flu season and the time just before half the staff go on holiday.
  • Leave a buffer around billing. A go-live just before the NFZ billing month closes adds work for the billing staff at the worst possible moment.
  • If you have several sites, go live in stages. One clinic first, then the next ones, using what you learned from the first go-live.
  • Plan on-call cover for the first days. Support has to be available from the moment reception opens, even if that is before 8:00.

Who to appoint on your team

A system switch will not succeed without your staff. Appoint:

  • a coordinator: someone who makes operational decisions and has time for the project
  • key users: one person each from reception, the consulting rooms and billing, who test the configuration and train others
  • a decision-maker (the management board or the head of the clinic) who settles matters beyond the project

Once the decision is made, our article on Optimed NXT data migration walks you through the implementation stages and data migration.

Our HIS, RIS and PACS implementation page lists the systems we implement. Book a first meeting: we start with your needs and only then talk about a specific system.

Contact us

Let's talk about IT in your hospital or clinic

Briefly describe what your hospital or clinic needs. We will reply within one business day at the latest. You can also call +48 81 820 05 09.

The data controller is CONETSO GROUP Sp. z o.o. We process the data from this form to reply to your message. Details and your rights are described in our privacy policy.

Search this site